2nstonge
Gold Member
I ordered a CCM tiller yesterday (& a landscape rake, too), so that the good folks at CCI can cut the PTO to the correct length & ship everything I need the measurement from the base/stub of the rear PTO drive to the midpoint of the centerline of the lower draft links mounting point - draft links must be level in the horizontal position & at a 26" spread.
I took delivery of the 4110 in December, the BH was attached & I'm just realizing the dealer didn't leave the 3pt hardware or the ballast box! I must've been too excited to notice. I've had no reason to remove the BH until now & I can't connect with the dealer until Saturday...any help would be great!
Thanks much, -Norm
I took delivery of the 4110 in December, the BH was attached & I'm just realizing the dealer didn't leave the 3pt hardware or the ballast box! I must've been too excited to notice. I've had no reason to remove the BH until now & I can't connect with the dealer until Saturday...any help would be great!
Thanks much, -Norm