advise please: difficult workshop build

   / advise please: difficult workshop build #51  
Then I'll be the one, mesh is worthless for more reasons than stated above.

I've demo'd a lot of concrete driveways over the years. The ones with wire take a lot more work to break up then ones with out. When you run across a driveway poured right; 3000 psi, wire, 6" thick, well compacted ground underneath; poured at a reasonable slump; they are very difficult to break up with a back hoe.
 

Tractor & Equipment Auctions

UNUSED 20PCS Industrial Polyester Lifting Straps (A53117)
UNUSED 20PCS...
2008 Ford F-750 Crew Cab Pro Patch TCM-425-135 Asphalt Patcher Truck (A51692)
2008 Ford F-750...
UNUSED DIGGIT 10' WROUGHT IRON SITE FENCE (A54757)
UNUSED DIGGIT 10'...
Biljax Indoor Scaffolding (A52377)
Biljax Indoor...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2014 MACK GU713 WATER TRUCK (A54756)
2014 MACK GU713...
 
Top