advise please: difficult workshop build

   / advise please: difficult workshop build #51  
Then I'll be the one, mesh is worthless for more reasons than stated above.

I've demo'd a lot of concrete driveways over the years. The ones with wire take a lot more work to break up then ones with out. When you run across a driveway poured right; 3000 psi, wire, 6" thick, well compacted ground underneath; poured at a reasonable slump; they are very difficult to break up with a back hoe.
 

Tractor & Equipment Auctions

2014 Bobcat 15C Skidloader PHD (A50774)
2014 Bobcat 15C...
Gladiator 12-16.5 Tires (A50322)
Gladiator 12-16.5...
2008 Ford Taurus X SUV (A50324)
2008 Ford Taurus X...
2015 Ford Econoline Shuttle Bus (A50323)
2015 Ford...
2007 JLG 41AM DC Electric Vertical Mast Lift (A50322)
2007 JLG 41AM DC...
2016 Hurricane Blo-Vac X3 Stand-On Blower (A50322)
2016 Hurricane...
 
Top