SamWalton
Platinum Member
I have been taking the time to install and test our implements. While removing the back hoe I found a sleeve or collar was missing on the lower link. I installed the new sleeve while installing the rotary cutter. I have also installed the rear blade. I will install and test the PD15 auger and box rake later. I made many adjustments to get the cutter in its proper position. I will read up on the theory and methods of adjustments of the three point and proper positioning of the cutter. Any advice is welcome.
Last edited: