Building the Shade house
We're digging one trench (365' long) with the 42" hoe bucket & putting the primary electric line at 4' deep in one corner & the water line at 3' deep on the other side of the trench. I just finished getting it all staked out with the electric co-op. All I have to do is fill out the application & give them a check of course /w3tcompact/icons/frown.gif & then I can schedule them out to place the electric line & run it to their ground transformer. From there, the General Contractor will be able to hook up a temporary service so he has power to build.../w3tcompact/icons/smile.gif Then I can have the water hooked up anytime.
As things progress, I hope to post the building process. Right now the weather DOES NOT look good /w3tcompact/icons/frown.gif