Best time to get driveway repaved?

   / Best time to get driveway repaved? #11  
I had a road done and a bunch of driveways in October (in northern climate) and it's aged fine (complete redo). I don't think time of year matters a great deal if they're doing it right. The real best time is when gas prices are lowest to save you money! For patching the warmer the better
 
   / Best time to get driveway repaved? #12  
When does your state budget come up? A month or two before that happens, they go on a spending spree to get rid of all the money that they have in their budget so they can say that they need more money for the next year. During this spending spree, they start more road projects then any other time in the year. Here, it started over the summer, about the end of July, beginning of August. When that happens, all road building materials jump in price because the government agencies demand certain mixes and grades of materials that cost more to create. I'm sure there is a lot of corruption in this too, but in my experience for just buying road grade gravel, it's a big jump in price because the quarry gears up to meat their demand and quantities they require. As a small time consumer, I'm not too important to all those multi million dollar contracts.

Once all the road work is done, things slow down, and prices adjust back down to normal. So in my area, late Fall through early Spring are when you get the best prices.
 
   / Best time to get driveway repaved? #13  
Kentucky has biennial budget with work spread out. I have not seen large variations in prices due to state bidding projects. Contractor work load is primary driving force
 
   / Best time to get driveway repaved? #14  
Top coat it in summer, pavement doesn't last very long in Maine, the frost lifts it pretty bad in Febuary/March.. 12 years is about all we get out of a paved driveway. My mom lives in MA, her driveway still looks pretty good after 45 years, very little to no frost down there.
 
   / Best time to get driveway repaved?
  • Thread Starter
#15  
The concrete is also cracked and is in two small patches each about 10' long and 2' wide. The entire driveway is one big crack. I thought about having them tear it all out and haul it off and do the base and everything again. Don't know if that would help,

RSKY
 
   / Best time to get driveway repaved? #16  
I would think in your location if they prepare it correctly, it should last a long time without cracking etc..
 
   / Best time to get driveway repaved? #17  
The concrete is also cracked and is in two small patches each about 10' long and 2' wide. The entire driveway is one big crack. I thought about having them tear it all out and haul it off and do the base and everything again. Don't know if that would help,

RSKY

Concrete and asphalt is about 80% base and prep. Adding good over bad typically doesn't work out well. If taking the existing out is an option I'd opt for that every time.
 
   / Best time to get driveway repaved? #18  
Get it done when they are repaving the road in front of your house. My dad did this and they did his - last of day. Screed was hot,and the truck beds were also. May have been street mix that got put down. He paid in 100.00 bills. They seemed real happy.
 
   / Best time to get driveway repaved? #19  
I just got a couple quotes... and a couple more are coming, for a long driveway serving four homes including ours. For 6750sqft @3in thick including grading/gravel/prep, the quotes were both about $25K plus state tax. This is over well packed and maintained gravel (30 years old) but steep slope.
 
   / Best time to get driveway repaved?
  • Thread Starter
#20  
The company I got the quote from is the one everybody uses. Supposedly they are the largest around and do the best job. I have seen their work and they are good.

Thanks for the advice everybody. I have checked my finances closely and I don't think we need to do another major job this year. Putting it off six months will let me build up funds AND I am having a small shed built with some large equipment on the drive. So now would not be a good time. The shed should have been finished but the builder contacted me that a three day job he was on was going to take three weeks (they found rot under the siding around all the windows in a house) then the rains hit. So it wont be finished until middle/end of October.

Once again TBN as come thru and I thank all of you for your comments.

RSKY
 

Tractor & Equipment Auctions

2015 Toyota Prius (A53424)
2015 Toyota Prius...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2019 BOBCAT S770 SKID STEER (A52705)
2019 BOBCAT S770...
2012 Ford F-250 Pickup Truck (A52377)
2012 Ford F-250...
2023 54' Hooklift Dumpster 15 Cubic Yard (A53422)
2023 54' Hooklift...
2007 Ford Focus Hatchback (A54815)
2007 Ford Focus...
 
Top