Best time to get driveway repaved?

   / Best time to get driveway repaved? #21  
Rsky
Get a quote to replace everything. 1 1/2" overlay will not last over heavily cracked base. With cracked base I would have a 3" overlay
 

Tractor & Equipment Auctions

2006 Magnolia Dry Fertilizer Tender Trailer - Dual Stainless Compartments, Hydraulic Doors (A55301)
2006 Magnolia Dry...
2016 Ford F-550 Altec AT37G 37ft Insulated Bucket Truck (A52377)
2016 Ford F-550...
Chery 7' 35 Drawer Workbench (A50120)
Chery 7' 35 Drawer...
2013 Ford F-150 4x4 Crew Cab Pickup Truck (A53422)
2013 Ford F-150...
JOHN DEERE 5125R LOT NUMBER 24 (A53084)
JOHN DEERE 5125R...
MASSEY FERGUSON 492 TRACTOR (A51406)
MASSEY FERGUSON...
 
Top