Compaction topic, it's not settling that is an issue, it's uneven settlement that is the issue. So, yeah, compact it, but once we are down to the last inch, or so, if we have 5% settlement, that's like 1/8th inch, ie insignificant. When we are talking about a 8" fill; that starts to matter.
Point being, if we get everything to +/- 3" with a machine, and even that +/- 3" to +/- 1" with clean sand; i wouldn't sweat the compaction of the sand too much.
Edit; i guess the part I'm assuming, but I should say, we aren't talking +3" along on entire side, and -3" on the entire side; then spreading sand...
Point being, if we get everything to +/- 3" with a machine, and even that +/- 3" to +/- 1" with clean sand; i wouldn't sweat the compaction of the sand too much.
Edit; i guess the part I'm assuming, but I should say, we aren't talking +3" along on entire side, and -3" on the entire side; then spreading sand...