The BH is utilized again and the bridge is leveled.
The rock ends on three edges up to the base of the bridge need to be rebuilt - moved a foot out and up to the bridge base and wings. These rock footings were put in place before the metal bridge idea was formulated. The corner rocks are in the process of being dug out and re-stacked.