this is one of the last artesian wells we drilled on the north side of Jacksonville i just happened to snap a pic of. it was descent, probably 8-12 psi and about 30-40gpm. i've seen some that really rock and roll though. heres one. 6" closer to 250-300gpm.
havent really messed around much south of Jax Beach, but we do have one or two in St. Johns county and some around Southside. i'd think your well is closer to the 450, and maybe deeper.. but dont quote me, this is kind of a nutty area and it can change alot within a short distance.
i wouldnt think building over the open well is even an option, it would never get passed.. you will be required to plug that well (and i would agree), meaning concrete from the limerock to the top of the casing. so long as this is done, i wouldnt think twice about building over it. these wells are cased all the way to the limerock, so no worries as long as its professionally plugged.
yes, you could always move the house somewhere else. but hey, if you're dead set on building on that spot then plug it, i wouldnt blame you either way. you can always drill another artesian well.. just takes $$