Lol! That's a good one! Rereading my post, I can see how you would think that. :laughing:
 
   / Building a stick frame house in the woods in 90 days
  • Thread Starter
#102  
Day 23

Came home from work today and noticed this sign on the road leading down to the building site:

day23-1.jpg


Could they have actually delivered and stood up the foundation today?

Nah, but they did drop off 6 loads of gravel, so we must be getting close!

day23-2.jpg


day23-3.jpg
 
   / Building a stick frame house in the woods in 90 days #103  
This is going great!
 
   / Building a stick frame house in the woods in 90 days #104  
That's some good looking gravel :)

David Sent from my iPad using TractorByNet
 
   / Building a stick frame house in the woods in 90 days
  • Thread Starter
#105  
Spoke to the builder and here's the plan for next week:

Walls coming Monday
Plumber Tuesday
Pour slab Friday
Start framing the following Monday
 
   / Building a stick frame house in the woods in 90 days #106  
Nice! Will keep watching closely.
 
   / Building a stick frame house in the woods in 90 days #107  
That's some good looking gravel :)

David Sent from my iPad using TractorByNet

For some reason this struck me as funny. Here we are on a website admiring gravel?!? Some could think that was a little strange.

By the way, this thread is amazing. Great job.

MoKelly
 
   / Building a stick frame house in the woods in 90 days #108  
Spoke to the builder and here's the plan for next week:

Walls coming Monday
Plumber Tuesday
Pour slab Friday
Start framing the following Monday

Keep it coming Pete, I am already pulling my hair out! Looks like things are going good. LUTT
 
   / Building a stick frame house in the woods in 90 days
  • Thread Starter
#109  
Sure Lutt! Here you go!

Day 24

The nice looking gravel :D has been leveled and is now ready for the walls to be set on it.

The piles are gone!

day24-1.jpg


A nice thick base in the basement:

day24-2.jpg


Loaded up the rest of the cut logs for the final run to the mill. They fit just perfect. Was "only" a 14,120 lbs load though.

day24-3.jpg


He snagged it up in a single pinch and dropped it right onto the "hopper":

day24-4.jpg


I then went back and loaded the junk hardwood logs that nobody wants and transported it the 0.5 miles to my place (no, I would not dream of driving a load like that on a public road with a single strap!) There was more than I thought and I still didn't quite get everything. I'll clean up the rest of the pile over the weekend.

day24-5.jpg
 
Last edited:
   / Building a stick frame house in the woods in 90 days #110  
Pete, you got her looking good. Thanks for the time and effort to post pics. I hope you truck is doing okay after the recent work you had to do on it. The trailer and log cradle also look like there doing well for ya.LUTT
 

Tractor & Equipment Auctions

2018 FORD F-550XL SERVICE TRUCK (A51406)
2018 FORD F-550XL...
2018 INTERNATIONAL LT625 SLEEPER (A51222)
2018 INTERNATIONAL...
Terms and Conditions (A47384)
Terms and...
1987 FORD 2110 TRACTOR (A51222)
1987 FORD 2110...
2008 PETERBILT 335 DAY CAB (A51222)
2008 PETERBILT 335...
2001 DITCH WITCH 8020 RIDE ON TRENCHER (A51242)
2001 DITCH WITCH...
 
Top