I have a 14 ft PJ dump trailer and I put on side extenders about a ft high. level it will take 2.5 cords. I burn wood in a wood furnace. I bought the trailer to haul rock to build my shop, we go out, cut and split the wood. Stack it,:thumbsup: 2ft pieces, I have two areas to put wood in both will hold about 7 cord each. The nice thing about the dump trailer is I back it up to the shed open the doors remove the last row, close the doors, lift the box, the top of the doors are about mid thigh and as you remove the wood it slides down. 40 minutes and two people can stack the full load.