OP
Darren
Veteran Member
- Joined
- Feb 16, 2002
- Messages
- 1,038
- Location
- WVa
- Tractor
- Kubota L3710, Ford 5600, Case MB4/94, Kubota B6200
Egon, there is an opening at the far end of the pit to the downhill side. That's for the water lines to feed and drain the cistern. It would have to be enlarged quite a bit to get anything in. I'm planning on setting the mixer on the flat around the pit. The slope below the cistern is too steep to set equipment on.
There's maybe a foot or so of earth on the top and then it's all rock from there on down. I stopped digging when the excavator couldn't break the rock out. I'm not sure whether the idea was to line the pit or the cistern. The liner wouldn't last long against the rock. If the cistern is built right, it won't leak.
I'm open to any ideas. Even something oddball might either work or trigger another idea or modification.
There's maybe a foot or so of earth on the top and then it's all rock from there on down. I stopped digging when the excavator couldn't break the rock out. I'm not sure whether the idea was to line the pit or the cistern. The liner wouldn't last long against the rock. If the cistern is built right, it won't leak.
I'm open to any ideas. Even something oddball might either work or trigger another idea or modification.