tommu56
Elite Member
Dave
I would burry conduit and a spare 3 ft below bottom of stream bed fill trench back up with concrete holding conduit so it will get encased conduits 1 foot all aroud pipes use tw type wire.
Bring the runs to surface about 10 to 15 ft back from each bank of the stream put in a grade level pull box (Quartsite with open bottom work good) and make splice in each box that way when you have to trouble shoot it it will be just pull cover and check out.
When it gets washed out mabee it would come apart at splices and not rip out the rest of the system.
tommu56
I would burry conduit and a spare 3 ft below bottom of stream bed fill trench back up with concrete holding conduit so it will get encased conduits 1 foot all aroud pipes use tw type wire.
Bring the runs to surface about 10 to 15 ft back from each bank of the stream put in a grade level pull box (Quartsite with open bottom work good) and make splice in each box that way when you have to trouble shoot it it will be just pull cover and check out.
When it gets washed out mabee it would come apart at splices and not rip out the rest of the system.
tommu56