David Neisen

   / David Neisen
  • Thread Starter
#11  
No problem with the RANT, you are spot on. Congratulations for the future plans! Unfortunately, you left me no crumbs in figuring out how to post a question.... so this forum or this link is basically useless to me.
 
   / David Neisen
  • Thread Starter
#12  
Thank you much for the suggestion. I will do that here and again. (BTW: There is no such button anywhere above, so I may need to do more 'responses' before I get to post). So here we go.....

I have purchased acreage to build a final home. On my very clayey till, level site near a stand of trees, the previous owner had dug two 13' diameter pits, each 10' deep. I don't know why. Apparently he did not get a permit to do what he wanted, and he then refilled in both pits with the same hard clayey till, he dug out - except for a pile of boulders and stones left in a pile on the side. My QUESTION IS... both piles have settled an inch or two from the level of grade - How long will these pits need to completely settle so I can build on them? Is there a way to speed up that settling? Thanks.
 

Tractor & Equipment Auctions

2003 CATERPILLAR M316C MOBILE EXCAVATOR (A52707)
2003 CATERPILLAR...
2001 Chevrolet C6500 Wrecker Tow Truck (A55852)
2001 Chevrolet...
2007 Freightliner B2 School Bus (A55852)
2007 Freightliner...
12' CONTAINER (A52706)
12' CONTAINER (A52706)
2014 Ford F-150 Ext. Cab Pickup Truck (A55852)
2014 Ford F-150...
2017 KENWORTH T4 CONCRETE MIXER TRUCK (A51243)
2017 KENWORTH T4...
 
Top