Flying MXZ
Bronze Member
If we use the 1500 cubic yards from above and assume full (struck) buckets (0.1815 cubic yards on Kubota's site with the bigger bucket) coming out we come up with 8265 loads. If we assume 5 minutes per bucket (which seems short to me) we are almost at 700 hours just removing material. I would hire it done myself.