Dig septic bed with front end loader

   / Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

UNUSED FUTURE SB45 HYD SILENT BREAKER (A52706)
UNUSED FUTURE SB45...
2016 Ford Explorer AWD SUV (A56859)
2016 Ford Explorer...
8 TOOTHED BUCKET FOR MINI EXCAVATOR (A58214)
8 TOOTHED BUCKET...
Hatz Diesel 6 Inch Water Pump (A57453)
Hatz Diesel 6 Inch...
Volvo ECR235CL (A53317)
Volvo ECR235CL...
New/Unused Heavy Duty Skid Steer Auger (A57454)
New/Unused Heavy...
 
Top