I'll take some pics and see if I can get them uploaded. It's a mess.
The stumps are going to stay. Even if the excavator averaged 5-10 minutes per stump, it would still take a month of Sundays to dig them out.
Maybe wait until all the weeds die and burn the entire field. That should eliminate some debris and expose some stumps. But raking a burnt field with OROPS would be another nightmare. It just needs to be clean enough to plant pines.
The stumps are going to stay. Even if the excavator averaged 5-10 minutes per stump, it would still take a month of Sundays to dig them out.
Maybe wait until all the weeds die and burn the entire field. That should eliminate some debris and expose some stumps. But raking a burnt field with OROPS would be another nightmare. It just needs to be clean enough to plant pines.