Yes Highbeam, Just 12.5 wide. I added dirt at the sides to hold the gravel in so I got a full 12'. It should be good for a single lane drive. Cut triangles for the corners and overlapped about 1'.
By the way, Still made time to go out and play. Nomally I'm riding a 600 two stroke twin this time of year but the sled stays in the barn so far. Pretty greasy, the guys on 4 wheelers can almost keep up with the bikes.
John, I'm told if you dig down to a solid base you can skip the fabric but then you have to raise it back up with base fill. Just think of it as saving time and money.
No snow in the mountains either Willie ? Maybe all of Dec and Jan snow will dump at once and you can do a super test.
Larry