swmich42
Bronze Member
Looking at finally getting a FEL for my 4700, and wanted to request some insight on bucket choices.
The Specific job that will finally bring me the ability to purchase the FEL is a seawall project, where I will need to place 18"-30" boulders along a 100' shoreline.
Will a traditional bucket work for this task, or would I require one of the "foundry" buckets and or "rock" buckets to do this job?
I will later use this front end loader to move dirt, brush, logs, small tree's, etc. Since I have never owned a FEL for my 4700, I need this forum's knowledge to help me in choosing what would be best to go with.
The Specific job that will finally bring me the ability to purchase the FEL is a seawall project, where I will need to place 18"-30" boulders along a 100' shoreline.
Will a traditional bucket work for this task, or would I require one of the "foundry" buckets and or "rock" buckets to do this job?
I will later use this front end loader to move dirt, brush, logs, small tree's, etc. Since I have never owned a FEL for my 4700, I need this forum's knowledge to help me in choosing what would be best to go with.