Going rate for dozer and operator?

   / Going rate for dozer and operator? #1  

60047

Bronze Member
Joined
Mar 19, 2019
Messages
76
Tractor
Still searching
I have ten acres of lightly wooded land that needs clearing. I've tried a disk mulcher, drum mulcher and just popping the trees one by one. The result is not what I'm looking for. I recently saw a Cat 963 smooth out a couple acres without even trying to hard.

What is the going rate for a medium-sized (~D6) dozer and operator? I'd like to have an idea of what to expect before calling around.
 
   / Going rate for dozer and operator? #2  
Depending on where you are located, rates will vary $150 low side to $200 hr plus transport costs range $250-350? each way. Then you will have a few piles of trees to burn/remove too. Depending your final plans and soil type you may need topsoil etc.
 
   / Going rate for dozer and operator?
  • Thread Starter
#3  
I'm outside of Chicago. Yes, the burning isn't a problem.
 
   / Going rate for dozer and operator? #4  
A dozer is good for shoving over trees but not good at making piles that actually burn. You’ll probably end up having to get a trackhoe to burn and pile everything.
 
   / Going rate for dozer and operator? #5  
I hired a D6 last winter for $115 per hour, since he was there all day no trip charge. Another operator was $95 per hour with a $100 trip charge he had a John Deere 750.
 
   / Going rate for dozer and operator? #6  
I recall a fella in south central MO advertising on FB Marketplace for maybe $85 an hour. I think he had a minimum of say 4 hours. Some go that route instead of having an extra transport fee. I can rent a JD650 that's about 75 miles away for $515 a day plus whatever it costs to transport it. Or, $1515 a week. But then I have to run it so having a skilled operator is preferred for me.
 
   / Going rate for dozer and operator? #7  
I'd hire the 963 waaay before a dozer. Like 4570 said, dirt doesn't burn well and a dozer can't make a good (tall) pile.
A good operator on a 963 will have a lot of trees (including the stumps) in a pile in a days time.
 
   / Going rate for dozer and operator? #8  
I'd hire the 963 waaay before a dozer. Like 4570 said, dirt doesn't burn well and a dozer can't make a good (tall) pile.
A good operator on a 963 will have a lot of trees (including the stumps) in a pile in a days time.

A loader is made for loading not clearing. They might be a little better at building a pile vs a dozer but they still can’t pickup and carry trees. And they don’t have any good way to dig a tree bigger than it can push. A trackhoe is what you need.
 
   / Going rate for dozer and operator? #9  
I'd argue with that, the slightly less efficient tree digging of a loader is more than offset by the moving of the trees to a central burn pile that is totally impractical with an excavator. Smaller trees pop right out and you can "roll" a dozen at a time to the pile. By the time your there the root ball is mostly free of dirt. Same thing for bigger trees, just not as much. Don't get me wrong, I love an excavator, but have done a LOT of clearing with a 953, one size under a '63.
Ideally it would have a root rake with clamps.
Screenshot_20210708-121752_DuckDuckGo.jpg
Screenshot_20210708-122028_DuckDuckGo.jpg
Screenshot_20210708-122028_DuckDuckGo.jpg
 
   / Going rate for dozer and operator? #10  
A large trackhoe will move brush better than you’re giving it credit for. You can dig up several small trees and grab them all in the thumb and carry them. A root rake with clamps would be a game changer on the track loader but a machine that just pushes is hard to move brush and build a pile with.
 

Tractor & Equipment Auctions

Running Gear (A47809)
Running Gear (A47809)
24ft Corral Panel (A47809)
24ft Corral Panel...
2021 DURAHAUL STEEL END DUMP (A47001)
2021 DURAHAUL...
2007 Mack MR688S Sermac 5RZ53 53 Meter Concrete Pump Truck (A45336)
2007 Mack MR688S...
2016 Yamaha Wolverine UTV (A47369)
2016 Yamaha...
AGT MX-CRT23 (A46443)
AGT MX-CRT23 (A46443)
 
Top