riptides
Super Member
Yep. Mortar mix to the mesh on two sides. Mesh attached to wood. A couple of true 2x10s holding it up. When I got to the bottom...5 whacks with the sledge hammer to get the last bricks to cave in. Built really well.So the chimney bricks were built on top and didn't come down to the floor?