60F and sunny @ 13:00, that should be the day's high. Clinton Station reports the low there this morning was 28.7F ...
Local weather folks talking about the possibility of the "S" word this coming weekend ...
Got a call yesterday from the secretary at the driller in Mansfield that their guy was about 1/2 hour out ... postponed the friend's project get together for a bit.
Good meeting with the driller, he's going to work up a quote with a couple of different options, including having a new well drilled ... which he said would be significantly less than what our our original driller was talking.
Found out that getting a rig on the well is probably going to require some significant tree trimming ...
He's supposed to email me the quote.
After he left I contacted my friend, he came over and we loaded up parts and ran over to his place and checked the fit on his lift and then came back and I welded everything up and sent him on his way.
With that out of the way I came back on down to the house and did a little clean up in the garage and fired off the torpedo heater just to make sure it would fire up.
Then headed to the basement and drained the pressure tank to check the pre charge ... it had zip/zilch/nada... which explains the well pump short cycling.
So I fired up the little Craftsman compressor and got the pressure tank pumped up to around 44 - 46 psi. Once (re)pressurized it seemed to hold air just fine and did not have any obvious leaks.
I've got the settings on the pressure switch jacked up to 50+ psi for the cut-in and 75 psi for the cut-out ... due to the all the complaints about "no water pressure" ...
Did some checking on the amount of draw down on pressure tanks and found out that the higher the pressure you have the system operating at, the less draw down you actually have. So probably will drop the cut-in pressure down a little bit at some point ... which will cause the pump to run less often but for a longer time when it does run.
Will need to check that pre charge pressure again in a few weeks/month ... just make sure it's still holding pressure. And add that as a recurring task on my calendar.
After that did some more separating of softener salt from brine.
Then got all the measurements for studs for the 4' section on the west wall and an 8' section on the south wall.
Agenda for today:
Dole out another week's worth of meds.
Pay a couple of bills.
Then get outside and start blowing more leaves off the lawn down here around the house.
Wind is out of WSW @ 9 ... so good for blowing on the east side but so much on the west side as I have to blow those to the west.
After that probably more work in the utility room project.
Otherwise, just see what comes up.
Hope everyone is having a decent Tuesday ...