HOOTSBX23
Member
Installed the Piranha Bar today finally. I missed my vacation window from the earlier post. So this weekend I start the destruction of my yard.
Bar installs very easy.
Initial cut was into the base of the hill to level it out. Ground is top soil for 6" and then clay. Ground is still moist so clay is cutting like butter. It's a terrace actually, so the car trailer will sit level along side the road. This is where I'm backing in to get my gravel closer to where it needs to go. I live on a hillside so everything like this is a challenge. Well that was until now, thanks BXpanded.
Pictures will have to wait. I just popped on here to find out how to fix my throttle cable that quit working out of the blue. Got 3 3/4 tons of #2 to unload still and my new access ramp to the backyard.
Bar installs very easy.
Initial cut was into the base of the hill to level it out. Ground is top soil for 6" and then clay. Ground is still moist so clay is cutting like butter. It's a terrace actually, so the car trailer will sit level along side the road. This is where I'm backing in to get my gravel closer to where it needs to go. I live on a hillside so everything like this is a challenge. Well that was until now, thanks BXpanded.
Pictures will have to wait. I just popped on here to find out how to fix my throttle cable that quit working out of the blue. Got 3 3/4 tons of #2 to unload still and my new access ramp to the backyard.