The below note is off the corps web page. For Rob, the steel mills do keep a stock of raw materials so as to not shut furnaces down while great lakes are froze over. Having said that, there are boats operating in the lower lakes all this winter. We call them the " southern shallow ponds" :laughing:
-----------------------------------
The Sault locks are not scheduled to reopen until March 25. While the relatively mild winter might have allowed for an extended shipping season, the U.S. Army Corps of Engineers says the Soo Locks closure is necessary to complete necessary maintenance. Copyright 2021 WLUC. All rights reserved.Jan 13, 2021