Gotta remember that aggregate size and edge distance for rebar are also a factor.
 
   / Ground Beams and pouring a new slab next to an existing one. #22  
3 years ago I had a 24x40 6" 4000# slab poured for a metal barn. No rebar but 2 saw cuts and the slab cracked on the saw cuts. There is no difference in elevation on the floor. It cost me $1800.00 for concrete and $1300.00 cash for the pour and finishing. My neighbor did a 24x26 and spent $8100 for his slab with rebar and mesh. Bill C
 

Tractor & Equipment Auctions

KUBOTA M5660 SU TRACTOR (A52706)
KUBOTA M5660 SU...
VERMEER NAVIGATOR 53 D23X30111 DRILL (A51406)
VERMEER NAVIGATOR...
2021 CATERPILLAR D4 LGP CRAWLER DOZER (A51246)
2021 CATERPILLAR...
2008 KZ Sportsman Police Bunk 5th Wheel Tri-Axle Travel Trailer (A54815)
2008 KZ Sportsman...
Manac Walking Floor Trailer (A50322)
Manac Walking...
2011 Manac 36245B30 43ft T/A Walking Floor Trailer (A50322)
2011 Manac...
 
Top