Gotta remember that aggregate size and edge distance for rebar are also a factor.
 
/ Ground Beams and pouring a new slab next to an existing one. #22  
3 years ago I had a 24x40 6" 4000# slab poured for a metal barn. No rebar but 2 saw cuts and the slab cracked on the saw cuts. There is no difference in elevation on the floor. It cost me $1800.00 for concrete and $1300.00 cash for the pour and finishing. My neighbor did a 24x26 and spent $8100 for his slab with rebar and mesh. Bill C
 

Marketplace Items

(APPROX.104), 2X4X8 NO.2 PRIME LUMBER (A60432)
(APPROX.104)...
2022 FORD F-150 XLT CREW CAB TRUCK (A59823)
2022 FORD F-150...
SANY SY225C9C5KL EXCAVATOR (A59823)
SANY SY225C9C5KL...
UNUSED ZJG ZJ-380 STAND ON SKID STEER (A60430)
UNUSED ZJG ZJ-380...
2016 AutoHauler CX11HCSD T/A Car Hauler Trailer (A56857)
2016 AutoHauler...
2023 MERCEDES BENZ SPRINTER 3500 CARGO VAN (A59905)
2023 MERCEDES BENZ...
 
Top