bindian
Super Member
I have been monitoring the pond leaking water past the overflow culvert.  A week ago Friday, I noticed water bubbling in the middle of my driveway.  I immediately drained the pond down and starting digging around the overflow culvert's end concrete.  I put concrete around it when I realized the culvert was too low, and I didn't want to raise the culvert.  I spliced in, an end plug on the culvert and cut out the top. I sealed all the splice seams with concrete.  Then I built a form and poured concrete.  This has worked for 8 years.
But while I am working enlarging the island pond, the ducks have made the small pond their nightly home. They have dabbled all around the dam and the concrete.
So, last Saturday, I dug the dam out around the culvert behind the existing concrete and install forms for concrete. Nothing is square as I was in a hurry to get the concrete poured before dark. Besides, it will all be covered with dirt.

hugs, Brandi
	
		
			
		
		
	
				
			But while I am working enlarging the island pond, the ducks have made the small pond their nightly home. They have dabbled all around the dam and the concrete.

So, last Saturday, I dug the dam out around the culvert behind the existing concrete and install forms for concrete. Nothing is square as I was in a hurry to get the concrete poured before dark. Besides, it will all be covered with dirt.


hugs, Brandi
			
				Last edited: 
			
		
	
								
								
									
	
		
			
		
		
	
	
	
		
			
		
		
	
								
							
							 
 
		






 
 
		