Initial excavation for gravel road build... how deep?

   / Initial excavation for gravel road build... how deep? #21  
On my 800' driveway we took the 10-12" of loam off until hitting clay then put a foot or more of bank run down. Been driving on it for a couple of months and next month will top with 3/4 crushed. Held up great during some storms.
 

Tractor & Equipment Auctions

2017 Snapper Pro 48in Zero Turn Commercial Mower (A51691)
2017 Snapper Pro...
2020 Kubota Sidekick RTV-XG850 (A47384)
2020 Kubota...
2014 CATERPILLAR CT660S SBA 6X4 DUMP TRUCK (A51406)
2014 CATERPILLAR...
HYSTER S50FT STRAIGHT MAST FORKLIFT (A51242)
HYSTER S50FT...
2018 TAKEUCHI TB210R EXCAVATOR (A51242)
2018 TAKEUCHI...
Walinga Agri-Vac (A50514)
Walinga Agri-Vac...
 
Top