Initial excavation for gravel road build... how deep?

   / Initial excavation for gravel road build... how deep? #21  
On my 800' driveway we took the 10-12" of loam off until hitting clay then put a foot or more of bank run down. Been driving on it for a couple of months and next month will top with 3/4 crushed. Held up great during some storms.
 

Tractor & Equipment Auctions

UNUSED LANDHONOR PF-11-3500G PALLET FORKS (A54757)
UNUSED LANDHONOR...
2008 MARIAH SKI BOAT (A54756)
2008 MARIAH SKI...
Ford Super Duty Pickup Truck Bed (A51691)
Ford Super Duty...
NEW HOLLAND TN95EA TRACTOR (A54756)
NEW HOLLAND TN95EA...
N14 TURBO (A54756)
N14 TURBO (A54756)
2020 CATERPILLAR 259D3 SKID STEER (A52705)
2020 CATERPILLAR...
 
Top