This where the new spillway will be.
Monday we'll put in the iron and pour this cut on the left of the picture.
This will be where our new ramp to get in and out of the pond will be located, over the new beam.
We've used up just about all of our sand and gravel at the other location. And we have seventy plus yards stockpiled about fifty feet from this cut.
So we'll move the mixer, water barrel, and process to this end of the pond. It will put us closer to the majority of our work. It will also enable us to clean up the other end and prepare it for final detailing.
Maybe by then it will look like we're doing something besides making one heckuva mess.