The two flat bars with the foot welded on one end are attached to the threaded blocks that are welded on the bucket. To do this use the 2 J style bolts that you have to remove from the round crossbar on the front of the tractor (be sure to clean out the threads in the block on the bucket before fastening the stands ).
Once the stands are secure remove the wedge locks on each side of the loader uprights. Once removed use the hyds. to raise the lift arms up out of the saddle, when these raise up a square hole will be visible, insert the other two supports in these hole to help balance the loader.
Can't remember for sure you may have to back the tractor up enough so that the supports will clear rear loader supports.
Once all supports are in place and clear of loader supports again use the hyds. to set the loader on the ground, then turn off the tractor release hyd. pressure on the hoses by working loader control valve, then unplug your hoses.
Before uncoupling hoses be sure to mark them, if they are not color coded, this will make it easier to reconnect in the right location.
Hope this will help.
