Eric_Phillips
Platinum Member
Once I get the ground loose with the disc I need to windrow the gravel out. Should I run the rake around first with it perpendicular to the line of travel to get the rock to the top then turn the rake to get the rock into windrows? How deep should I set the guage wheels? And lastly what about the top link? Since the soil is already loose does it matter how the top link is set, short of long? Thanks for any tips.
Eric
Eric