moving concrete:

   / moving concrete: #11  
Wow, $750 to rent a concrete pumper for a few hours? And I thought my part of the country was the most expensive place to get anything done. I guess it all depends on the specific job - if they have to run hose for a thousand feet, then it's going to cost an arm and a leg. Also, if they need to come in with a boom pumper to get over a house or way up in the air, then I could see some big dollars attached to it.
 
   / moving concrete: #12  
And, this job would take at least three trucks - they're definitely not going to want to tie up three trucks for a few hours of wait-time. I suppose it would be possible to stagger the delivery times, but I sure wouldn't want to be the one coordinating that one... It's hard enough to get just one truck delivered when you expect it.
 
   / moving concrete:
  • Thread Starter
#13  
First truck leaves arrives at 7:30 am second truck leaves shop at 8:30 1/2 hour to arrive. Truck shoot will reach into garage door. I only have to run back and forth. Its either this or wheel barrows. Concrete company allows 15 minutes per yard. 10 yards per truck alot of work. Let you know how we make out.
 
   / moving concrete: #14  
You're lucky, we only get 5 minutes a yard, with 9 yards on a typical truck. The clock starts as soon as they pull into the yard.
 
   / moving concrete:
  • Thread Starter
#15  
Job went very well. Ended up being 25 yards started at 7:45 10 yards first truck empty by 9:00 that included stopping to go get my Lasser level. Truck 2 done by 10:40 had to take tractor out of basement after 6 yards and start wheelbarrowing rest. No room to work tractor. Took lunch while the truck went back to refill. Done with last 5 yards by 12:30.
 
   / moving concrete: #16  
darn good job mm!!! howd it feel usin a wheelbarrow vs. the fel /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif i got my iseki 4x4 last nov and ill move hell and high water to just not to use a wheelbarrow again..am eve cutting the better halfs 4' flower beds back to 3' (they arent finished yet any way) /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif THank God!! so i canget thru to the other side of the house..the back of our house is a 20' cliff so i cant go round that wayand i'l be dadgumned ifn im gonna use a wheelbarrow when iv'e got the fel!!! /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif..I used to live in williamsport by the way /forums/images/graemlins/cool.gif
TODD
 

Tractor & Equipment Auctions

UNUSED FUTURE 71" CLIP ON FORK EXTENSIONS - PAIR (A51244)
UNUSED FUTURE 71"...
2014 CATERPILLAR 740B OFF ROAD DUMP (A51242)
2014 CATERPILLAR...
Year: 2015 Make: Peterbilt Model: 320 Vehicle Type: Truck Mileage: Plate: Body Type: Trim Level: (A51692)
Year: 2015 Make...
2018 Dodge Charger Sedan (A50324)
2018 Dodge Charger...
2008 Ford F-750 Crew Cab Pro Patch TCM-425-135 Asphalt Patcher Truck (A51692)
2008 Ford F-750...
2021 John Deere 333G Compact Track Loader, 390 Hours, High Flow Hydraulics, Ride Control (A52128)
2021 John Deere...
 
Top