Let me jump in here. I have never used an Excavator mounted mulcher, but I have been to Demos. My thoughts are: 1. Too slow.
2. Too expensive for use on flat lands wher a skid steer can go much faster.
3. Big Investment.
4. More suited for ditches, road, pond, and stream banks.
I am more convinced that the way to go is the skid steer mounted mower(Ambusher, Davco, etc. used ahead of a fixed tooth mulcher. I am getting 5 to 6 acres per 6 hr. day with the Ambusher and the same out of the Mulcher behind the Mower. The stuff I'm in is 30 year old pine thinned to a 60 Basal area with two year sweetgum mixed with burned older growth gum, black cherry and cedar. The dead stuff breaks down with the Ambusher. You just need to go over it once with the mulcher to get a good grind.
The Ambusher brings $85/hr with the mulcher getting $120 for a total of $205/hr. That works out to $ 200-250/ acre. Since I'm charging by the hour, the landowner is getting a great deal. If I had bid the job, I would have bid at least $500/acre.
The tract is 136 acres. We'll end up doing about 40 acres of "criticle" area.
This is a great winter time job. The dust would be horrible in summer.
The land owner told me today he probably will be ok with just the ambusher, but wants to see how the finish looks behind the mulcher in the thicker areas before he decides. The thin hilltops look good with just the Ambusher.
I would post pics if I knew how.
Mowermoney