goeduck
Super Star Member
That sounds about what I would have expected. So money wise you could have built "75%" of it this year and it would have cost an additional 25% this year compared to last just factoring in the higher lumber. Other things are up so maybe 30% more. I am looking at building a barn so curious where you came out. Thanks for the input.I spent 14k on lumber, right now it's sitting at about 300%, that's nearly 45k.
To date i'm at 96k, I just added it up today. From the stone, buying the 24" bucket for the backhoe, buying the bobcat to do cleanup, concrete, block, stone, rebar, wire mesh, pex, lumber, steel joists, siding, garage doors, man doors, nails, screws, rafters, siding, roof panels, trim, and a bit of labor.