OP
rangerfredbob
Veteran Member
I'm with you so far, I only had so big of a piece of steel on hand... it's spanning 3 joists (4x4's so a little sturdier in some ways) and lag bolted at the front and has threaded rod at the rear through the joists and in the center it's through the top plate of the wall at the junction.
I'm going to run with it for now but will likely add a support going back further in the middle, might be just an eye bolt and cable...
I'm going to run with it for now but will likely add a support going back further in the middle, might be just an eye bolt and cable...