New Thumb Build

   / New Thumb Build #51  
image-1007951038.jpg

Here's the description of what each valve is in picture 1 the aux relief Is #5 it should have hoses a6 and b 6 going into it

To adjust it you loosen the jam nut and and tighten the Allen screw to raise the pressure and loosen the screw to lower the pressure than tighten the jam nut again
 
   / New Thumb Build
  • Thread Starter
#52  
This is what the Takeuchi dealer sent me today. I'm thinking this is what I need??




Steve, here is what I found on thumb kits. #12 is a overload valve. I have two in stock @ 171.87 It shows only using one in the kit. Hope this helps


View attachment DOC021215.pdf
 

Tractor & Equipment Auctions

2019 INTERNATIONAL LT625 TANDEM AXLE SLEEPER (A52577)
2019 INTERNATIONAL...
2017 Taylor-Dunn B0-248-36 Electric Utility Cart (A50324)
2017 Taylor-Dunn...
CFG Industrial Q.A Hydraulic Breaker (A50121)
CFG Industrial Q.A...
Pickup Truck Bed (A51691)
Pickup Truck Bed...
2015 JLG Triple-L Flatbed T/A Trailer (A50324)
2015 JLG Triple-L...
JLG Skytrak 6042 6,000LB 4x4 Rough Terrain Telehandler (A50322)
JLG Skytrak 6042...
 
Top