Thanks. That's actually not too bad of a price. I have been thinking about a barn / multi purpose building about that size. Way off in the future, maybe a year. You're making great progress for sure!
I was quoted $126K for a modular / prebuilt, raised center aisle from a local company, with about 15 months of lead time. The metal buildings I had quoted were $40K to $60K, without site prep or concrete. Some of that was simply timing: Absolute peak of the building marketplace, with high material prices and low labor availability.
Fiscal issues aside, this is something the wife and I have been wanting to do for a long time. It's hard on an aging body that's accustomed to sitting at a desk most days. It takes up a lot of free time. But we find it satisfying.