Pat's Easy Change Pat's Easy Change System

   / Pat's Easy Change System #11  
Re: Pat\'s Easy Change System

Hey there

Hooking up the the 3 point to implement doesn't seem to be a problem for me. It's that darn PTO shaft hook up to the PTO shaft to the implement. That darn hook up to tractor, just have hard time lining up. Get grease all over hands etc. That's the part I don't like. Is there an easy way to do that?

Cheers...Coffeeman
 
   / Pat's Easy Change System #12  
Re: Pat\'s Easy Change System

Practice, patience - and gloves

//greg//
 
   / Pat's Easy Change System #13  
Re: Pat\'s Easy Change System

I was afraid the answer was something like that.
 
   / Pat's Easy Change System #14  
Re: Pat\'s Easy Change System

I had the same problem with my Rhino cutter PTO. I took a small file and filed a bevel on the teeth. It helped a lot. The tractor PTO shaft is hardened so you won't file it. A small grinder could help. Overall, a very slight bevel - 1/16" or so, helps you get the shaft started.

As far as quick hitch goes, my Speeco is tops. I plan to buy a second and put it on my FEL so I have a long boom pole.
 
 

Tractor & Equipment Auctions

1437 (A57192)
1437 (A57192)
1639 (A57192)
1639 (A57192)
2018 International Durastar 4300 Altec LR756 56ft. Insulated Forestry Chipper Bucket Truck (A55852)
2018 International...
1340 (A57192)
1340 (A57192)
2015 Ford F550 Altec Bucket Truck (A52377)
2015 Ford F550...
1540 (A57192)
1540 (A57192)
 
Top