Pole building question

   / Pole building question #1  

Newtocvt

Bronze Member
Joined
Apr 11, 2017
Messages
99
Location
Menomonie,Wisconsin
Tractor
New holland 54d
I am thinking of building a pole building for general storage. Mostly for implements I don't want to leave out all winter. I don't need an insulated or heated building and was thinking about just gravel floor. Size wise I was thinking about 24x32 with one 9 foot garage door and a service door. No windows. The area I am thinking about slopes 2-3 feet over the 32' span. My question is can I set the post before the site is leveled and graded. My theory is I can set the post 4 feet deep with my post hole digger than the back full and gravel would essentially make the 6-7 feet deep. Any thoughts?
 
   / Pole building question #2  
I am thinking of building a pole building for general storage. Mostly for implements I don't want to leave out all winter. I don't need an insulated or heated building and was thinking about just gravel floor. Size wise I was thinking about 24x32 with one 9 foot garage door and a service door. No windows. The area I am thinking about slopes 2-3 feet over the 32' span. My question is can I set the post before the site is leveled and graded. My theory is I can set the post 4 feet deep with my post hole digger than the back full and gravel would essentially make the 6-7 feet deep. Any thoughts?


I think you will find it to be more than a major nuisance to be grading around posts already set.
 
   / Pole building question #3  
That. Even if it means you build a retaining wall.
Jim
 
   / Pole building question #4  
And do have a bldg code? Around here you'd need to have a footing under each post, inspected before backfill. Not a bad idea, even for storage.
Jim
 
   / Pole building question
  • Thread Starter
#6  
No building code here. I already checked with the township only thing they care about is the road setbacks. It sounds like I should just get the area prepared first.
 
   / Pole building question #7  
Prior proper preparation prevents poor performance.
 
   / Pole building question #8  
Couple of things we had a high lift level our pad and really compact it so it shouldn't settle. Second if you do metal I highly recommend insulating the roof or it is going to sweat and drop water on your implements, the bumble wrap to do my 30x40 was an extra 300$ well worth it. I would level, compact then set your posts
 
   / Pole building question #9  
I had a couple feet of fill added for my pole shed and had a driveable vibratory roller go aver it a couple times. When I had to dig for some plumbing pipes I had a difficult time shoveling and picking through it. That is a good thing and money well spent.
 

Tractor & Equipment Auctions

2008 Ford Taurus SEL Sedan (A55973)
2008 Ford Taurus...
2019 GENIE S-45 BOOM LIFT (A52709)
2019 GENIE S-45...
2021 Ford F-150 Ext Cab 4X4 Pickup Truck (A55852)
2021 Ford F-150...
Tube Broom 8, 5/8 x 58 Poly 26" (A59076)
Tube Broom 8, 5/8...
LOT: (9) Tires & Rims: 275/80 R22.5, 275/70 R22.5 and other sizes (A59076)
LOT: (9) Tires &...
New Wolverine 84in 5way Skid Steer Scrap Blade (A59000)
New Wolverine 84in...
 
Top