greyskies99
New member
Great suggestions all! I think for my application the 55 gal drum makes the most sense, although I am having trouble visualizing this. Is there a link vtsnowedin? Am I correct in assuming the concrete poured to the bottom of the barrel "pushes" the first concrete up and therefore doesn't become "contaminated" by the water in the form (drum)? Would adding rebar help to preserve integrity of the concrete? I am not familiar with types of concrete. What specifically should I look for? Would a 8" ABS or PVC pipe to the bottom of the barrel work for pouring? Dock would be permanent so I would just have to trust that the ice flows will go past my little bay...