Here are the pic's from this weekend's progress.
Here is the completed steering column bracket. All I need to do, is weld the black column to the red pipe once it's installed. The red plate on the bottom will get bolted to the plate on top of the transmission.
Here's the new next to the old.
Here's the almost finished plate on top of the trans. I will be welding a bracket off to the left of it to support the power steering double-acting cylinder. I haven't started that bracket, but it shouldn't be hard. I will need to cut the sheet-metal if it stays permenant. However, I have plans on moving the front axle a couple inches forward next year, so then I'll be able to use the FEL brackets as a mount for the cylinder.
Here is the cylinder laying about where the new bracket will be made.
Here is the completed steering column bracket. All I need to do, is weld the black column to the red pipe once it's installed. The red plate on the bottom will get bolted to the plate on top of the transmission.

Here's the new next to the old.

Here's the almost finished plate on top of the trans. I will be welding a bracket off to the left of it to support the power steering double-acting cylinder. I haven't started that bracket, but it shouldn't be hard. I will need to cut the sheet-metal if it stays permenant. However, I have plans on moving the front axle a couple inches forward next year, so then I'll be able to use the FEL brackets as a mount for the cylinder.

Here is the cylinder laying about where the new bracket will be made.