Rural Infrastructure thread

/ Rural Infrastructure thread
  • Thread Starter
#41  
So, my group, we are supposed to have a manager, 3 office side/tech types; and 3-5 field guys (think supervisor, but its actually inspection/review/QC). Right now, our manager has 1 week as manager. Of the 3 office types; we have 1, and they have 7 months of experience; and the field, excluding me, 1 at 15 months, 1 at 10 months, and 1 at 7 months. Im a field type, with about 12 years; but they are going to pull me to put in the office as a temporary fill it. So, years in positon; very very low

And none of these are the type of thing that you learn in a year
 

Marketplace Items

PRESSURE WASHER (INOPERABLE) (A68842)
PRESSURE WASHER...
2009 Chevrolet Tahoe SUV (A66738)
2009 Chevrolet...
213101 (A64276)
213101 (A64276)
2015 CATERPILLAR D6T LGP HIGH TRACK CRAWLER DOZER (A65056)
2015 CATERPILLAR...
2018 HINO 268 4X2 S/A 26FT BOX TRUCK (A69167)
2018 HINO 268 4X2...
27001CFL (A66736)
27001CFL (A66736)
 
Top