ugabulldog
Silver Member
- Joined
- Jun 22, 2010
- Messages
- 125
- Location
- GA
- Tractor
- '04 MF 451 diesel shuttle shift w/ MF 1040 loader
I have watched videos when you have a big pile the technique is go into bottom of pile with bucket level go forward and raise bucket when tractor starts to stall, curl up, raise curl repeat. I have some small piles of gravel I need to move that are only 1-2 ft in height so this doesn't work so well. What is the best technique, please be as detailed as possible including when to stop tractor during process, and also do I need to back up and make several approaches to get a semi full bucket? Thanks