Started my bridge

   / Started my bridge #11  
I think 3X12 would be a better choice than the 2x6x8.

Agreed. Thats why I mentioned it.

IF the spans between joists exceed 12", I want something more than a 2x board between me and the bottom.
 

Tractor & Equipment Auctions

UNUSED FUTURE FM57 57" HYD FLAIL MOWER (A57193)
UNUSED FUTURE FM57...
2016 Chevrolet Traverse LT SUV (A55853)
2016 Chevrolet...
UNUSED PABREAK SPIN3-84" SNOW PUSHER (A57193)
UNUSED PABREAK...
202482 (A54757)
202482 (A54757)
UNUSED FUTURE SB45 HYD SILENT BREAKER (A52706)
UNUSED FUTURE SB45...
UNUSED FUTURE XJ3T-3T HYD THUMB CLAMP (A57193)
UNUSED FUTURE...
 
Top