Steel Building Prices

   / Steel Building Prices #11  
As a construction professional who is involved with the design and erection of steel buildings, I do not understand why it should cost more to have a formed drip ledge instead of a formed groove filled with mortar, assumming everything else is the same.

Is there some other consideration I'm missing? How can one justify embedding the bottom of the wall sheets as a money saver?
 
   / Steel Building Prices #12  
As a construction professional who is involved with the design and erection of steel buildings, I do not understand why it should cost more to have a formed drip ledge instead of a formed groove filled with mortar, assumming everything else is the same.

Is there some other consideration I'm missing? How can one justify embedding the bottom of the wall sheets as a money saver?

Because it is a money thing. Their industrial base plate that I bought for my 30x50 was $1200. Forming a trough, and dropping the edge of you building in there, then backfilling it with 'crete is just about free except for a little bit of labor. Not so free in 20 years when it corrodes off right at the concrete then blows away in a big wind................

industrial base plate vs troough explained w/pic's:
Pioneer Steel Buildings. Foundation Types. USA.
 
   / Steel Building Prices #13  
Because it is a money thing. Their industrial base plate that I bought for my 30x50 was $1200. Forming a trough, and dropping the edge of you building in there, then backfilling it with 'crete is just about free except for a little bit of labor. Not so free in 20 years when it corrodes off right at the concrete then blows away in a big wind................

industrial base plate vs troough explained w/pic's:
Pioneer Steel Buildings. Foundation Types. USA.

Gotcha. Yes, any of the methods I mentioned require something along the bottom to fasten the sheets to. I usually design with angle. Although the cost is minimal when taken as part of the whole, it is indeed more expensive than no attachment at all.

Personally I would pay more or do without. No way would I ever choose the trough method myself.
 

Tractor & Equipment Auctions

2023 New Holland CR10.90 Combine - 332 Engine Hours - 244 Separator Hours (A52748)
2023 New Holland...
2017 Nitro Z 19ft Bass Boat with 26ft T/A Boat Trailer (A51694)
2017 Nitro Z 19ft...
2020 Ford F-350 Pickup Truck, VIN # 1FTBF3A68LEC75327 (A51572)
2020 Ford F-350...
2018 Sakai SW990-1 Tandem Vib Roller (A52384)
2018 Sakai SW990-1...
AGT Mini SkidSteer (A50322)
AGT Mini SkidSteer...
19104 (A51694)
19104 (A51694)
 
Top