Timber Frame Build - Round 2

   / Timber Frame Build - Round 2 #352  
Take a bow, that is nice!

You do all the little things, looks like you put a ton of thought into all of this. The sidewalk circling the tree is a nice touch as well.
 
   / Timber Frame Build - Round 2 #353  
I still say you have a "knack" with putting the pieces in the right places.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#354  
Take a bow, that is nice!

You do all the little things, looks like you put a ton of thought into all of this. The sidewalk circling the tree is a nice touch as well.

Thanks everyone. My sidewalk contractor started to run string lines for forms around the outside of the tree. I had him circle it despite his disagreement. He was worried about root damage long term. I ran some conduit under the sidewalk for power and told him if we ever start to see signs of damage the tree could be cut and would make a nice place for a fountain.

I made a trip to Oklahoma yesterday to pickup all of the stone veneer for the outside of the building. I plan to start stonework this weekend. Getting the stone done should really tie everything together on the outside. Today's plan is to start trimming out all of the doors for the bridal suite upstairs.
 
   / Timber Frame Build - Round 2 #355  
Why Oklahoma? Better prices or just the only place to get the type of stone that you wanted?
 
   / Timber Frame Build - Round 2
  • Thread Starter
#356  
Why Oklahoma? Better prices or just the only place to get the type of stone that you wanted?

Both. Same stone I used on the wedding patio columns. Was able to pick it up direct from the supplier doing the cutting there. Real stone veneer here after going through a couple of middle men runs anywhere from $9-12 sq/ft. Cost going direct was $4.50 sq/ft.
 
   / Timber Frame Build - Round 2 #357  
What city? I'm not currently looking for stone, but with what it costs here in Tyler, I've wondered if it was worthwhile driving up to Oklahoma and finding out where it comes from and buying it direct. At half the price, that would make it more then worthwhile!!!
 
   / Timber Frame Build - Round 2
  • Thread Starter
#358  
Solid Rock Stone
Shady Point, OK
 
   / Timber Frame Build - Round 2
  • Thread Starter
#359  
Finished the stonework and set the granite on the side area of the bar we added last night. Starting to wrap up a lot of the little items that needed finished now.

2018-04-27_12-42-06
 

Tractor & Equipment Auctions

2022 FORD F-150 XL EXT CAB TRUCK (A51406)
2022 FORD F-150 XL...
2019 Nissan Frontier SV 4x4 Ext. Cab Pickup Truck (A48081)
2019 Nissan...
Vacuworx MC3B Vacuum lifter (A50860)
Vacuworx MC3B...
2021 Ver-Mac PCMS-3812 Solar S/A Towable Trailer Message Board (A49461)
2021 Ver-Mac...
2008 Pro Pull Gooseneck Trailer (A50860)
2008 Pro Pull...
2015 Chevrolet Silverado 1500 Crew Cab Pickup Truck (A48081)
2015 Chevrolet...
 
Top