So I started at the bucket cylinder, added auxilary command (for rotator, jaw bucket, misc), it will be controled through emv witha a push of a button...
After that came the tricky part, kingpost "hosing" where all those lines + rotation, kingpost brakes and electric lines come together...there's the real party . Will post in few days...
Finished connecting left hydraulic distributor valve, moving on to the right.
By the way I'm checking every function with compressed air so I get those hoses in the best configuration and not messed up
First boom, upper and lower hoses connected. Also, lift cylinder done. There I installed hydraulic block valve for safety. Even in case my hoses break, this keeps the cylinder in place and prevents any boom movement