Hmmmm....I've had my DK45S TLB for one week. I have 28 hours on it so far. I've removed and carried about 30 boulders (20 in excess of one ton), disced a field and lawn (~7 acres) with a ten-foot set, bent an 8' Tuff-Line rake on a clay road

, shuttled ~10 4x5 round bales 2 at-a-time, dug 100' of field ditch and 30' of drainage tile, regraded my 625' dam (& farm road) with a 6' box blade, dug test pits to find a gravel supply, and dragged a 40's pickup truck with no tires from it's 30 y.o. resting place to the road. The tree growing thru the bed didn't stand a chance! I didn't get an opportunity to brushog yet....
I am thoroughly impressed with this machine, as I'm finding it hard to bite off more than it can chew. However, I'm 5'6, so I feel like I'm operating in my living room.

I thought I'd have a problem with the 10' discs, but it was though they weren't even there in H1 2-wheel drive.

I expect to mow and bale with this next week. I almost bought a used DK55, but so far the DK45 is plenty of machine. We'll see with the mower (they turn hard).
Oh....need grapple, forks, flail and apparently super duty rake.....
Hope I gave you a bit of perspective.