kentuckydiesel
Silver Member
- Joined
- May 30, 2004
- Messages
- 139
I recently uncovered an old well on our property which the previous owners had stopped using once they got county water.
Well is 50' deep with 30' of water in it (20' down from the top)...and we're in the middle of a drought! Casing is 6".
Anyway, I am going to put a hand pump and electric pump jack on the well. I'm in the process of making a pump cylinder which will be 2" ID with a 12" stroke. I am also planning to replace the old 1" drop pipe with 2" pipe so I can more easily change leathers when needed.
Here are my questions:
1)For this setup, what size and type of material should I use for the sucker rod?
2)I have heard of people using PVC for drop pipe. Is this a good idea, and if so, will Schedule 40 work, or would I need 80?
Thanks,
Phillip
Well is 50' deep with 30' of water in it (20' down from the top)...and we're in the middle of a drought! Casing is 6".
Anyway, I am going to put a hand pump and electric pump jack on the well. I'm in the process of making a pump cylinder which will be 2" ID with a 12" stroke. I am also planning to replace the old 1" drop pipe with 2" pipe so I can more easily change leathers when needed.
Here are my questions:
1)For this setup, what size and type of material should I use for the sucker rod?
2)I have heard of people using PVC for drop pipe. Is this a good idea, and if so, will Schedule 40 work, or would I need 80?
Thanks,
Phillip