No matter how long the driveway is, it is still cheaper to buy the fabric, than all the gravel you will buy over and over again. Not to mention the time and effort that can be spent on maintenance. Plus, with the fabric you can get away with less gravel to start with.
My system is excavate 4"-6", lay fabric. Apply #304 or #411 in total of (3) 2" layers. Wet down and compact each layer, even if it is just by driving over it. Cap the top with 1"-2" of #57, (3/4"). This keeps the "sand" off your shoes and tires, and gives a very nice finished appearance.
You can get away with less base, in light traffic areas, and can add more, if it is a heavy traffic area.
The guy I deal with, has a sing axle truck, and can tailgate it so well I don't have to do much of any raking.
My system is excavate 4"-6", lay fabric. Apply #304 or #411 in total of (3) 2" layers. Wet down and compact each layer, even if it is just by driving over it. Cap the top with 1"-2" of #57, (3/4"). This keeps the "sand" off your shoes and tires, and gives a very nice finished appearance.
You can get away with less base, in light traffic areas, and can add more, if it is a heavy traffic area.
The guy I deal with, has a sing axle truck, and can tailgate it so well I don't have to do much of any raking.