I have a septic drain field which is 2 feet deep, has 12 inches of drain rock with 4" drain pipe in the lower portion of the trench and 12 inchs of native clay in the upper portion of the trench. When I constructed the system last fall, I was able to backfill the trenches without running any equipment ontop of the drain lines. I allowed the drain field to sit for 9 months to allow for some natural compaction from rain.
My question is can I run my BX 2200 over the drain field to complete the finegrading and for mowing. Will the compactive efford made by the tractor degrade the workability of the system?